End-to-End NPI Solutions

From the first design review to packed production units, Bohui takes your new product through every stage of its introduction in its own factory in Dongguan, China.

One project team follows your product through design and engineering, EVT, DVT and PVT builds, mass production, final assembly and packaging. We machine, fabricate, mold, print, cast and finish the parts ourselves, check them with 20+ types of inspection equipment including ZEISS CMM, and send an engineer-reviewed quote within 24 hours. Our factory is certified to ISO 9001, ISO 13485, ISO 14001 and IATF 16949.

Common Challenges in New Product Introduction

Most launch delays start with a decision made too early or too late, and a problem found after tooling has started costs weeks and money to fix. These are the problems we see most often in new product introduction, and how we help you avoid them.

Design vs. Manufacturability

An attractive concept can still be expensive or impossible to make: walls too thin to mold, undercuts that need side actions, tolerances no process holds at a sensible cost. Every part gets a free DFM review before it is quoted, and changes are agreed with you before tooling starts.

Material and Process Choices

Few teams know every material and process. A grade chosen out of habit, or a process used because it worked last time, adds cost, weight or risk that shows up only in testing. We advise on grade and process by load, environment, finish and volume.

Manufacturing Strategy

The route that suits a prototype rarely suits production: machined parts may later need molds, printed parts cast or molded versions, and each change affects cost. With five processes under one roof, we plan prototypes, pilot builds and production without pushing one process.

Fragmented Supply Chain

With parts, plastics and packaging from different vendors, quality varies, schedules drift and your engineers manage suppliers instead of the product. We give you one factory, one project contact, one quality system and one set of inspection records for parts, assembly and packaging.

Late-Stage Design Flaws

Interference, tolerance stack-ups and assembly-order problems often appear only at the first complete build, when each fix means another round of parts, tests and delay. Assembly trials and fit checks in the EVT and DVT builds resolve them before pilot production.

Late Cost Surprises

Without an early estimate, the unit price becomes clear only at quotation or after tooling, when the design is hard to change. We estimate cost from the first CAD model and show what each feature, material and process adds, so cost is designed in.

NPI Solutions for Every Development Milestone

Choose support for a single stage or for the whole journey. Each stage has its own page with the services, deliverables and decisions to settle before you move on.

A person drawing with a scale ruler on paper at a wooden desk

Design and Engineering

Industrial design, mechanical structure design, CMF selection and design-to-cost for products that start as a sketch or an early CAD model. Our engineers review manufacturability, cost and risk before the first prototype is made, so the design you approve is one that can be built.

  • Manufacturing feasibility review and risk assessment
  • Design optimization and DFM analysis
  • Material, process and cost guidance
Output
Renderings, 3D models, engineering drawings
Hands with a caliper and a ruler over printed drawings beside a laptop

Verification (EVT, DVT, PVT)

Engineering, design and production validation builds that prove your product works, passes its tests and can be made consistently. We advise on materials and processes, plan assembly and tests, and run small-batch trial production with inspection reports. Each build closes with a summary of findings and next steps.

  • Material selection and process recommendations
  • Assembly sequences and test plans for EVT and DVT
  • Small-batch pilot runs under a quality control plan
Includes
EVT and DVT prototypes, pilot runs
Output
Test plans, phase summaries, inspection reports
CNC machining centers on a workshop floor

Mass Production and Assembly

Stable production after a validated pilot run: qualified materials, inspection from raw material to finished goods, engineers on the shop floor, and cost and delivery control. Products can be assembled, adjusted and tested before they ship. One project team carries your product from the pilot run into volume production.

  • Supplier qualification and incoming material checks
  • Process optimization by engineers on the shop floor
  • Assembly, adjustment and function inspection
Includes
Production, final assembly, final inspection
Output
Inspection records, COC, COA and COT
Warehouse shelves stacked with cartons on both sides of a long aisle

Packaging Development

Retail and shipping packaging developed alongside the product: structure and graphics, supplier evaluation, samples, transport and environmental tests, and a production plan, so the packaging is ready when the first batch is. Every design is validated under simulated shipping and storage conditions.

  • Structure, graphics and material selection
  • Cartons, paper bags, plastic bags and metal tins
  • Drop, vibration and compression tests
Includes
Design, samples, testing, production planning
Typical time
1–4 weeks
Drawing of a block with an angled face and a side port, a tilted cutter and two rotation arrows

Service Packages

Three packages that bundle the stages: a free Basic package for feasibility, DFM and risk checks, a Gold package for structural optimization and modular engineering services, and a Platinum package for end-to-end projects with a dedicated project manager. Prices are starting prices, confirmed after we review your files.

  • Basic report in 3–5 business days after we receive your files
  • Gold projects 1–6 weeks, Platinum projects 1–9 months
Basic
Free
Gold
From $980
Platinum
From $7,000

Why Choose Bohui for NPI

One factory, one project team and one quality system take your product from the first design review to packed production units.

01

One-stop solution

Design support, prototypes, pilot runs, production, assembly and packaging come from one factory and one project team. You deal with one supplier and one quality system, and what we learn in each build carries into the next instead of being handed between vendors.

02

Capabilities in our own factory

200+ CNC machines, including 20+ HERMLE and DMG MORI five-⁠axis machines, 20+ sheet metal machines, injection molding, 3D printing, vacuum casting and surface finishing in our own factory, so complex geometries, tight tolerances and fine finishes are made and checked under one roof.

03

Quality you can verify

First-article, in-process and final inspection on ZEISS CMM and 20+ types of inspection equipment, with a free CMM report for the dimensions you specify. If a part is wrong because of a manufacturing error on our side, we remake it free of charge.

Our Manufacturing Capabilities

Every NPI stage draws on the same processes, materials and finishes. We work with aluminum, steel, stainless steel, copper, brass and aluminum bronze, plastics such as ABS, PC, PMMA, POM, nylon and PEEK, and apply finishes from sand blasting and anodizing to painting, plating and polishing in our own factory.

Two machined metal parts resting on engineering drawings

CNC Machining

Milling, turning and five-⁠axis machining of prototypes and end-use parts in metals and plastics on 200+ CNC machines, with standard tolerances of ±0.05 mm and ±0.01–0.02 mm on precision features.

A welder at work in a large factory hall

Sheet Metal Fabrication

Laser cutting, punching, bending, welding, riveting and stamping on 20+ sheet metal machines, for enclosures, brackets, panels and chassis in aluminum, steel, stainless steel, copper and brass, from a single prototype to production runs.

Rendered beige and black ABS blocks

Injection Molding

Rapid and production tooling designed and made in-house, overmolding and insert molding for plastic parts, with no minimum order quantity, so you can move from bridge quantities to full production on the same design.

Rendered engineering plastic blocks and rods in natural colors

3D Printing

SLA, DLP, SLS, MJF and SLM printing for functional prototypes, complex internal features and low-volume parts, often the fastest way to test form and fit before you commit to machining or tooling.

Rendered clear polycarbonate and acrylic blocks

Vacuum Casting

Polyurethane parts cast in silicone molds from a master model, typically 5–100 pieces that look and feel like injection-molded parts. Vacuum casting is a fast, cost-effective bridge before you invest in production tooling.

Section drawing of a housing and its mating cover, with a datum mounting face and a probed locating bore

Assembly

Machined, sheet metal, molded and purchased parts assembled, adjusted and inspected to your drawings and process specifications, so you receive finished, inspected subassemblies or products instead of boxes of loose parts.

Ready to develop your new product?

Tell us the stage your project is at and send your drawings, sketches or CAD files. An engineer reviews them and replies within 24 hours with a quote or a proposal for the next step.

Our Own Factory in Dongguan. Shipping Worldwide.

Bohui makes the parts for your new product in its own factory in Dongguan. Machining, sheet metal, molding, printing, casting, surface finishing, assembly and inspection run under one quality system, and our engineers and project managers keep communication clear from the first review to delivery. We ship by international express and air freight to customers in more than 120 countries.

CNC machines

200+

with FANUC and SIEMENS controls

Five-⁠axis machines

20+

from HERMLE and DMG MORI

Sheet metal machines

20+

for cutting, bending and welding

Types of inspection equipment

20+

including ZEISS CMM

Quality Assurance for Every NPI Phase

Quality is planned with the product, not added at the end. Before production we agree the critical dimensions, inspection methods and acceptance criteria with you; during each build, parts receive first-article, in-process and final inspection; and every stage closes with records you can review.

Our 30+ quality engineers work with ZEISS CMM, 2D vision measuring systems, XRF material analyzers, gauges, micrometers and calipers. We provide COC, COA and COT documents and a CMM report free of charge for the dimensions you specify.

Our factory is certified to ISO 9001, ISO 13485, ISO 14001 and IATF 16949, so your product is made under internationally recognized quality, medical, environmental and automotive standards.

Two pressure gauges mounted on a machine

NPI Solutions FAQs

What is new product introduction (NPI)?

New product introduction is the process that takes a product from a validated concept to stable production. It covers design for manufacturing, prototype builds, engineering, design and production validation (EVT, DVT and PVT), material and supplier qualification, the ramp-up to mass production, assembly and packaging. Its aim is to find and fix design, process and supply problems while changes are still cheap, so that the first production batch ships on time, at the target cost and to specification.

What do EVT, DVT and PVT mean?

They are the three validation builds before mass production. The engineering validation test (EVT) checks that the design works, usually with prototypes made by CNC machining, 3D printing or vacuum casting. The design validation test (DVT) uses parts in production-intent materials and processes to prove that the product passes its functional, reliability and compliance tests. The production validation test (PVT) is a pilot run on production tooling and processes, which shows that the product can be made consistently. Details are on our verification phase page.

At which stage should I contact you?

As early as possible. A manufacturing review of a sketch or an early CAD model costs far less than changing a part after the tooling is made. Many projects start with our free Basic package or a free DFM review of the first files, then add design, verification or production support as they grow. You can also come to us at any later stage, for example with a validated design that needs a pilot run, production capacity or packaging.

Do I need to use Bohui for every stage?

No. You can use a single service, such as design support or a pilot run, or let us run the whole project. Our NPI service packages combine the stages at a published starting price, from a free Basic package for feasibility and risk checks to a Platinum package for end-to-end projects with a dedicated project manager.

Which files should I send to start?

Send what you have: sketches, photos of a reference product, 3D models in STEP, STP or IGES format, PDF drawings, a BOM or a product requirements document. Tell us the project stage, the target quantities, the target cost and your timeline. If you only have a sketch, our engineers can create a simple 3D model for the first review.

How fast will I get a reply?

We send an engineer-reviewed quote within 24 hours, and simple parts are often quoted in 2–4 hours. Complex five-⁠axis parts, precision medical parts and projects that need a DFM review are usually quoted within one working day, and urgent requests can be prioritized. Every quote is checked by an engineer, so what you are quoted is what we can make.

How do you keep quality consistent from prototype to production?

The same engineers, drawings and inspection plan follow your product through each build. Critical dimensions and acceptance criteria are agreed before production, parts receive first-article, in-process and final inspection, and an approved sample becomes the reference for later batches. We can provide samples, photos and dimensional inspection reports first, and move to small batches or mass production once you have confirmed them.

Can you assemble and package the finished product?

Yes. We assemble machined, sheet metal, molded and purchased parts to your drawings and process specifications, adjust and test them, and inspect appearance and function before packing. Retail and shipping packaging can be developed in parallel through our packaging development service, so that it is ready for the first production batch.

Do you have a minimum order quantity?

No. We make single prototypes, custom samples, small batches and larger production runs, and one-piece orders are welcome. That suits NPI work, where quantities grow from a few EVT units to pilot runs and production. Tell us the expected volumes for each stage, and we will plan processes and tooling to suit them.

Start Your NPI Project Today

Tell us about your product and the stage it is at, and our engineers will reply within 24 hours with a quote or a proposal for the next step.

Placeholder for a contact photo of Jane

Jane

BOHUI PROTOTYPES LIMITED

Tell me what stage your product is at, the quantities you plan for each build and your target launch date, and I will bring in the right engineers.

You can send sketches, CAD files or a product requirements document now and add details later by email or WhatsApp. For confidential designs, contact me before sharing your files.

Jane

BOHUI PROTOTYPES LIMITED

  • Address: Xiaobian Street, Chang'an Town, Dongguan City, Guangdong Province, China

Request a Quote

Fields marked  are required.

Jane BOHUI PROTOTYPES LIMITED Privacy Policy