Skip to content
Request a Quote
Menu
Placeholder for a photo (BH-A07-S01-I01)

Vacuum Casting vs Injection Molding

Choose between vacuum casting and injection molding on four points: how many parts you need, how closely the material must represent production, when you need the parts and how stable the design is.

Vacuum casting suits smaller batches of a design that may still change. Injection molding suits a settled design that needs repeat production in the actual thermoplastic. The two processes are not direct substitutes. A cast part is made from a casting resin chosen to resemble selected properties of a thermoplastic, while a molded part is made from the thermoplastic grade itself. That difference affects what each part can prove. Many projects use both: cast parts while the design is being evaluated, then a production mold once the design and the quantity justify it.

How They Work

The difference starts with the tooling, because each process places its investment at a different point in the project.

How Each Process Makes the Part

Both processes fill a mold with plastic, but the molds, the materials and the effect of a design change are different.

Vacuum casting

A master pattern of the part is prepared, for example by machining or printing, and used to form a silicone mold. The mold is cut open, the master is removed, and a two-part casting resin, commonly polyurethane, is poured in under vacuum to reduce trapped air. After curing, the part is removed and the mold is used again. Each silicone mold gives a limited number of parts before it needs replacing, and that number depends on the geometry, the resin and the required quality.

Injection molding

A mold is machined from metal, with the cavity, core, gate, cooling and ejection built in. Thermoplastic pellets are melted, injected under pressure, cooled and ejected, and the cycle repeats. The mold takes longer to make and costs more at the start, but it is built for repeated production, and a design change usually means modifying the mold.

Placeholder for a diagram (BH-A07-S02-I01)

Comparison

Those differences carry through to cost, quantity, material and timing, which is where the two routes are usually compared.

Compare the Two Routes

The table compares the processes in relative terms. Where your project falls depends on the part, the resin and the tooling proposal, so use it to frame the questions for your supplier rather than as a rule.

FactorVacuum castingInjection molding
Upfront toolingLower: a master pattern and silicone moldsHigher: a machined mold designed for the part
Batch sizeSmaller batches; silicone molds are replaced as they wearLarger and repeat quantities from the same mold
MaterialCasting resins that resemble selected thermoplastic propertiesThe specified thermoplastic grade, color and additives
Time to first partsUsually shorter, once the master is acceptedLonger, because the mold is made and trialed first
Design changesA new master and molds; easier to absorbMold modification; more costly once the tool is made

The cost per part moves in opposite directions. Cast parts carry less tooling investment but more work per part, while the price of a molded part falls as the mold cost is spread over a larger quantity. Ask for tooling and part prices separately for each route so you can compare them at your own quantities.

When to Cast

Start with the projects where faster changes and a lower tooling investment are worth more than parts in the production material.

When Vacuum Casting Fits

Vacuum casting fits when you need a batch of plastic parts that look and handle like the product, before the design or the demand justifies a production mold.

Design and appearance review

Parts for design reviews, presentations or user feedback, where surface finish and color matter and the design may still change.

Assembly and fit checks

A small batch to assemble with mating parts, check clearances and handling, on the understanding that the cast resin is not the production grade.

Market testing and pilot builds

Early units for trials, samples or a pilot run, while the production quantity is still uncertain.

Keep the material limits in view. A part cast in an ABS-like resin is chosen to resemble selected properties of ABS; it is not molded ABS. Tests that depend on the exact grade, such as heat resistance, chemical exposure, flammability or long-term load, generally need parts in the production material.

Placeholder for a photo (BH-A07-S04-I01)

When to Mold

When the parts have to behave like production parts, or the quantity keeps growing, the comparison shifts toward a mold.

When to Move to Injection Molding

Move to injection molding when the design is stable enough to commit to a mold and the parts need to be in the production material, at the production quantity.

  • The design has passed its main reviews, and further changes are expected to be small.
  • Tests or approvals need parts in the specified thermoplastic grade.
  • The quantity, including repeat orders, would need many silicone molds and a large amount of casting work.
  • Repeat orders need to come from one controlled tool and process rather than replacement silicone molds.
  • The cost per cast part is higher than the product can carry.

A part that casts well may still need more draft, more uniform walls or changes to its undercuts before it suits a production mold. Review the design for molding before the mold is ordered.

Both in Sequence

The choice does not have to be one route or the other. Many projects plan casting and molding as consecutive stages.

Use Both in Sequence

A common path uses vacuum casting while the design is being proven and injection molding once it is released. Planning the sequence from the start lets each stage prepare the next.

Cast parts for evaluation

Use cast batches for design, fit and user reviews. Record the findings against the design revision so each change can be traced.

Release the design for tooling

Freeze the revision that will be molded, with the resin grade, cosmetic faces and critical dimensions agreed. Changes after this point affect the mold.

Bridge with casting where needed

If parts are needed while the mold is being made and trialed, a further cast batch can cover the gap, provided its material limits are acceptable for that use.

Move to molded production

After the mold trials and sample approval, production continues from the mold, and the cast parts are no longer the reference.

Keep cast and molded parts distinct in your records. Results from cast parts support the design decisions they were made for; they do not replace a review of the first molded samples.

Placeholder for a diagram (BH-A07-S06-I01)

Your Enquiry

To compare the two routes for your own part, a supplier needs the same core information for both.

Bring Quantities and Material Requirements to the Quote

Quotations for the two routes are easier to compare when both answer the same brief. Include:

  • The current model or drawing and its revision.
  • What the parts must prove or do at each stage.
  • Quantities for each stage, including the repeat orders you expect.
  • The production resin grade, and whether a casting resin that resembles it is acceptable for early parts.
  • Cosmetic faces, color, texture and critical dimensions.
  • Target dates, stated as the milestone you need.

Ask for tooling and part costs separately for each route, at each quantity you are considering. Bohui produces vacuum cast parts and injection molded parts in its own factory, so you can ask about both routes in one enquiry.

Discuss the Requirement with Bohui

Share the part information and the decision you need to make.

Placeholder for a contact photo of Jane

Jane

BOHUI PROTOTYPES LIMITED

I'm Jane, the contact for your enquiry.

You can also reach me by email or on WhatsApp.

Jane

BOHUI PROTOTYPES LIMITED

  • Address: Xiaobian Street, Chang'an Town, Dongguan City, Guangdong Province, China

Request a Quote

Fields marked  are required.

Jane BOHUI PROTOTYPES LIMITED Privacy Policy