Planning Repeat Orders Without Drift

A repeat order should give you the part you approved, not one that has slowly changed.

To prevent drift, keep four things together and reference them in every order: the drawing revision, the approved reference sample, the process record of the approved batch and the tooling arrangement. Drift rarely comes from one large change. It builds up from small ones: an older drawing sent by mistake, material from a different source, a worn tool or a finishing step adjusted between batches. Together they move the part away from what you approved, and the difference often appears only at assembly. The steps below are a general framework for repeat orders of machined, molded and other custom parts. The details depend on the part and on what you agree with your supplier.

Revision Control

Start with the drawing, because every other reference points back to a revision.

Control the Drawing Revision

Every order should name the exact drawing and model revision the parts are made to. "Same as last time" is not a revision. If the drawing has changed since the last order, even only in a note or a tolerance, say so and send the new revision.

Keep one released revision per part number and withdraw superseded files. Where the supplier works from both a drawing and a 3D model, check that both carry the same revision and agree which one governs if they differ.

Part number and revision on every document

The order, drawing, quotation, inspection record and box labels should all show the same part number and revision.

A record of what changed

A short revision history on the drawing shows what changed and when, so the supplier can see the difference instead of comparing files line by line.

Deviations in writing

If an earlier batch was accepted with a deviation, record whether it applied to that batch only or to future orders as well.

Placeholder for a diagram (BH-A20-S02-I01)

Golden Sample

A drawing describes the part in words and numbers. Some of what you approved can only be kept as a physical part.

Keep a Golden Sample or Approved Reference

A golden sample is a part from an approved batch, kept as the physical reference for later orders. It shows what a drawing cannot fully describe: color, gloss, texture, edge condition and how the part fits and feels.

Choose the sample when the part is approved, not later from whatever is left. Take it from the approved batch, in the specified material and finish, and label it with the part number, revision, batch and approval date.

One set at each end

Keep matching samples at the supplier and with you, so both sides compare new parts with the same reference.

Stored away from use

Keep samples out of assembly trials and away from handling, light and heat, which can change their color and surface over time.

Renewed when the part changes

When a change is approved, approve and label a new sample and withdraw the old one, so it cannot be used by mistake.

For visible parts, limit samples that show the edge of what is acceptable can be kept with the golden sample.

Placeholder for a photo (BH-A20-S03-I01)

Batch Records

The sample shows what the part should look like. The batch record shows how it was made.

What the Supplier Should Record for Each Batch

A batch record lets you compare a new batch with the approved one and trace the cause if something changes. Its content depends on the process and the part, so agree what is recorded, how long it is kept and which parts of it you receive.

RecordWhat it capturesWhy it helps
MaterialGrade, source and lot identification, with certificates where requiredShows whether a material change could explain a difference
Process conditionsThe program, key machine settings or molding conditions usedLets the next batch start from the conditions that made good parts
Tooling and fixturesThe mold, cavity or fixture used, and its conditionLinks parts to the tool that made them and shows wear over time
Inspection resultsThe agreed features, the method and the resultsLets you compare batches with each other and with the approved one
Changes and deviationsAnything different from the approved batch, and who approved itMakes sure no change reaches you without a decision

For molded parts, the molding conditions of the approved samples are the starting point for each run. For machined parts, the program revision and the fixture used play the same role. Agree which records come with each delivery and which are kept on file for review.

Tooling

For molded and cast parts, the tool is part of the record, and it needs an arrangement of its own.

Agree Tooling Ownership, Storage and Maintenance

Molds, dies and dedicated fixtures are made for your part and usually stay at the supplier between orders. Their condition decides whether the next batch matches the last, so agree how they are owned and looked after when the tool is ordered, not when the next order is due.

Ownership

Who owns the tool once it is paid for, how that is recorded in the order and whether the tool itself is marked.

Storage and identification

Where the tool is kept between runs, how it is identified and protected, and what happens if no order is placed for a long time.

Maintenance and repair

Which routine maintenance is included, how repairs and replacement parts are authorized and charged, and how wear is reported before it affects the parts.

Transfer or end of production

What happens to the tool, its drawings and its records if production moves to another supplier or ends.

Before a reorder after a long gap, ask for the tool's condition to be checked and, where needed, for a sample to be approved before the full batch is run.

Placeholder for a photo (BH-A20-S05-I01)

Changes

A tool kept in good condition still makes the old part. A change between orders has to be decided before the next batch.

Handle Every Change Between Orders as a Change

Changes are a normal part of a product's life. Drift happens when they are made informally. Treat every change, from either side, the same way: describe it, review its effect, approve it in writing and update the references.

Changes you request

A change of material, finish, color or design gets a new drawing revision. Mark the change on the drawing and in the order, and ask how it affects tooling, price, schedule and inspection.

Changes the supplier proposes

A new material source, a different finishing process, a tool repair or a move to another machine can change the part even when the drawing stays the same. Agree that such changes are notified and approved before parts are shipped.

What a change resets

A change may need a new sample, a first article check of the affected features or a new golden sample. Agree which applies before the batch is made, not after it arrives.

Placeholder for a diagram (BH-A20-S06-I01)

Reorder

With the references, records and change rules in place, each reorder can be short and specific.

Reorder Efficiently

A well-prepared reorder is short. Reference the approved part and state only what is new, so the supplier can reuse the existing program, fixtures or mold without reopening questions that were already settled.

Include in each repeat order:

  • The part number and the drawing revision the parts are made to.
  • The reference to the approved sample and the last accepted batch.
  • The quantity, delivery date and destination.
  • Any change since the last order, or a statement that there is none.
  • The records and samples you need with this batch.

If you expect repeat demand, share a rough forecast early. It helps plan material, tool maintenance and production time, and as volumes grow it shows when a different route, such as a production mold, may be worth reviewing. Bohui produces CNC machined, sheet metal, injection molded, 3D printed and vacuum cast parts in its own factory, and you can send your reorder references with the next quantity you need.

How to Order · Low-Volume Manufacturing

Discuss the Requirement with Bohui

Share the part information and the decision you need to make.

Placeholder for a contact photo of Jane

Jane

BOHUI PROTOTYPES LIMITED

I'm Jane, the contact for your enquiry.

You can also reach me by email or on WhatsApp.

Jane

BOHUI PROTOTYPES LIMITED

  • Address: Xiaobian Street, Chang'an Town, Dongguan City, Guangdong Province, China

Request a Quote

Fields marked  are required.

Jane BOHUI PROTOTYPES LIMITED Privacy Policy