What Drives the Cost of Custom Parts

Six things drive the cost of a custom part: material, process time and setups, tooling, finishing, inspection and quantity.

Each one is set by the part design and by the requirements on the drawing, which is why two quotes for the same model can differ so much. Some of these costs are paid once, such as programming, fixtures or a mold. Others repeat with every part, such as material, machine time and finishing. Once you know which is which, you can read a quotation, compare suppliers and see where a design or specification change could lower the price.

Material

Start with the material, because it sets both the stock you pay for and how easily the part can be made.

Material and Stock

Material cost is more than the price of the raw material. A machined part is cut from stock larger than the finished part, so you pay for the whole bar, plate or block, including what ends up as chips.

Material also changes process time. Hard alloys and some engineering plastics cut more slowly and wear tools faster than free-machining grades. In molding, the resin price and the way it fills and cools both affect part cost, and special colors or grades may only be sold in quantities larger than your order.

Specified grade

A named grade with a required condition or certificate limits substitution. If only certain properties count, say which, so the supplier can suggest an equivalent.

Stock form and size

Common bar, plate, sheet and tube sizes are easier to source. Ask whether a small dimension change would let the part use standard stock.

Material documents

Certificates and compliance declarations may need a particular source. Ask for them in the enquiry, not after the order.

Placeholder for a photo (BH-A09-S02-I01)

Process Time

Once the material is set, look at the time needed to prepare and run each operation.

Process Time and Setups

Process time is the time the part spends on a machine or in a process step. Setup is the work done before the first good part: programming, preparing fixtures, loading tools and checking the first piece. Setup costs much the same for a few parts or many, so it weighs most heavily on small orders.

Geometry drives both. In CNC machining, each extra orientation usually means another setup, and deep or narrow features slow the cutting. In sheet metal, each bend, tool change and weld adds handling. In 3D printing, part volume, build height and support removal add time.

Features that tend to add process time:

  • Features that can only be reached from several sides.
  • Deep cavities that need long, slender cutting tools.
  • Sharp internal corners where a radius would work.
  • Thin walls or long unsupported features that must be cut slowly.
Placeholder for a diagram (BH-A09-S03-I01)

Tooling

Setups repeat with each batch. Tooling works differently: it is paid for once and then shared across the parts it produces.

Tooling and How Its Cost Spreads over Quantity

Some processes need a dedicated tool before the first part can be made. An injection mold, a die casting die and a silicone mold for vacuum casting are each made for one part design. The tool is a one-time cost, so its share of each part's cost falls as more parts are made from it.

That is why a molded or cast part can look expensive in a small order and much cheaper in a larger one, while material and cycle time stay roughly the same for each part.

Injection molds

Cost depends on part size and complexity, cavity count, side actions for undercuts, surface texture and the production volume the mold is built for. Changes after the mold is made mean tool modifications, so settle the design first.

Die casting dies

A die for aluminum or zinc alloy includes features for filling, cooling and ejection. Machining and finishing after casting are separate operations, so ask for them to be listed apart from the die.

Silicone molds

A silicone mold copies a master pattern. It is simpler than a production mold but makes a limited number of parts, so a larger batch may need several molds. Ask how the master and molds are included.

Placeholder for a photo (BH-A09-S04-I01)

Tolerances and Finishes

Tooling sets the starting cost. The requirements on the drawing decide how much work each part needs after the main process.

Tolerances, Finishes and Secondary Operations

Tighter tolerances cost more because they need slower cutting, more careful setups and more measurement. A general tolerance on the drawing that is tighter than the part needs raises the cost of every feature it covers. Apply tight limits to the features that control fit or function, and let the rest follow a general tolerance standard.

Finishes add the process itself plus the preparation and handling around it. Inserts, heat treatment, assembly or special packaging are separate work, so list them and every supplier can quote the same scope.

Requirements that add work after the main process:

  • Cosmetic surfaces that must be free of visible marks.
  • Masking of threads or contact faces before coating.
  • Color matching to a reference.
  • Threaded inserts or press-fit hardware.
  • Heat treatment or plating to a specified thickness.
  • Assembly, kitting or custom packaging.
Placeholder for a diagram (BH-A09-S05-I01)

Inspection

Every requirement you add must also be checked, and checking takes time too.

Inspection and Documents

Inspection cost depends on what is checked, how and how often. A visual check and a few measurements are quick. A full dimensional report, a first article inspection or a functional test takes longer and may need specific equipment or an outside laboratory.

Measuring every part costs more than checking an agreed sample from each batch. The right choice depends on how critical the feature is and how stable the process is.

Features to check

List the features that must be measured and recorded, instead of every dimension on the drawing.

Records to supply

Name the reports you need, such as a first article or dimensional report, and whether they apply to the first order or every batch.

Quantity

With the work on each part defined, quantity decides how the one-time costs are shared.

Quantity and Repeat Orders

Quantity changes cost in two ways. One-time costs such as programming, fixtures and tooling are shared across more parts, and longer runs cut handling time per part.

Repeat orders usually cost less to prepare, because programs, fixtures and tools already exist. The saving depends on the design staying the same: a revision can mean new programming, a tool change or a new sample. If you expect repeat demand, include it in the first enquiry, even as a rough plan.

Cost elementWhen it is incurredEffect of a larger quantity
MaterialEvery partStays per part; larger purchases may help
Process timeEvery partStays per part; longer runs reduce handling
Setup and programmingEach batch, mostly the firstShared across more parts
ToolingOnce, before productionShared across all parts the tool makes
Finishing and inspectionEvery part or batchMostly per part; batch checks are shared

Reduce Cost

Knowing where the cost sits shows where a change can save money without changing what the part does.

Reduce Cost Without Losing Function

The safest savings remove work the part does not need, not work that protects its function. Review the design and the specification together, confirm each change with the supplier and record it in a new drawing revision.

Checklist before you request quotes:

  • Apply tight tolerances only to features that control fit or function.
  • Add internal radii instead of sharp internal corners where the design allows.
  • Avoid deep pockets and thin walls that force slow cutting.
  • Reduce the number of directions a part must be machined from.
  • Choose standard stock sizes, sheet thicknesses and common grades.
  • Limit cosmetic finishes to the surfaces a user will see.
  • Combine or simplify parts where the assembly allows.
  • Share a realistic quantity plan so tooling matches expected demand.

Compare Quotes

When you send the design for pricing, a clear brief makes the quotes you receive comparable.

Get Quotes You Can Compare

Quotes are comparable only when every supplier prices the same part, in the same condition, at the same quantity. Send each supplier the same drawing revision, material, finish, inspection requirements and quantity scenarios, and ask for the same breakdown back.

Bohui produces CNC machined, sheet metal, injection molded, 3D printed and vacuum cast parts in its own factory. Send your drawing and quantity plan, and say which cost elements you want to see separately.

Ask each quotation to show:

  • Tooling, master or fixture costs as one-time items.
  • The part price at each quantity you asked about.
  • The finishing, secondary operations and inspection included.
  • The samples, documents and packaging included.
  • Any assumptions made where your brief left a point open.

The RFQ preparation guide gives a reusable outline for the rest of the enquiry.

Discuss the Requirement with Bohui

Share the part information and the decision you need to make.

Placeholder for a contact photo of Jane

Jane

BOHUI PROTOTYPES LIMITED

I'm Jane, the contact for your enquiry.

You can also reach me by email or on WhatsApp.

Jane

BOHUI PROTOTYPES LIMITED

  • Address: Xiaobian Street, Chang'an Town, Dongguan City, Guangdong Province, China

Request a Quote

Fields marked  are required.

Jane BOHUI PROTOTYPES LIMITED Privacy Policy